Công Nhân May Mặc Lê Thị Kim Cương | ứng viên tìm việc Dệt may tại An Giang
Tên trường: Đại học giao thông vân tải Thành Phố Hồ Chí Minh
Giai đoạn: 2006 -2009
Tên khoa: 6
Địa chỉ: An Giang
Ghi chú học tập: Kỹ thuật cơ khí - vận hành
Tổ chức: GS E&C Co., Ltd
Giai đoạn: 2010-12-01 -2012-11-01
Hình thức làm việc:
Chuyên môn: - Supervising the sub-contractor doing HVAC, Fire protection, Plumbing and drainage. - Directs and manages the daily activities of the site work and report to M&E manager. - Control and manage Sub-con to ensure they operate and carry out the installation work in according to Shop drawing, materials and equipments approved. - Set-up and control contractor to ensure all activities with best quality, safety and on time. - Coordinate with all related members and all systems to ensure installation works not conflict. - Preview and check the shop drawing prior to submit to consultant. - Make ITP document of Mechanical system. - Responsible of supervising mechanical system: HVAC, Fire protection, Plumbing and drainage, Swimming pool. - Drawing checking, coordinate with engineer and manger to clear the query issues related HVAC. - Supervising installation of HVAC, Fire protection, Plumbing and drainage system. - Testing and commissioning HVAC, Fire protection, Plumbing and drainage system. - Finding and solving problem of HVAC, Fire protection, Plumbing and drainage system. - Monitoring and reporting quality of HVAC, Fire protection, Plumbing and drainage system. - Mainternance work of mechanical system.
Tổ chức: HYUNDAI E&C (Mong Duong I 2x500MW Coal Fired Power Project).
Giai đoạn: 2012-11-01 -2015-10-01
Hình thức làm việc:
Chuyên môn: 1. From Nov 2012 - to Nov 2013 . Supervising for mechanical, piping works. MECHANICAL SUPERVISOR – HYUNDAI E&C (Mong Duong I 2x500MW Coal Fired Power Project). - Supervise subcontractors at site to ensure that subcontractors activities are carried out in accordance with the approved subcontractor quality plan and report to manager daily. - Attend construction meeting, progress meeting with Manager, Subcontractor. - Preparing Piping Plans, Piping Layout, Equipment Layout, ISO Drawings. Reviewing P&ID, Equipment Drawings and Structural Drawings. - Carried out Detail design of Plant piping and Pipe lines (LSTK Projects). - Prepared Valve Data Sheet, Scope of work, Pipe line routing, Population density calculation, various piping calculations used for process piping and pipe lines. - Preparing piping safety instruction sheets with the required calculations for pipe wall thickness,Maximum allowable operating pressure (MAOP), and test pressure. - Supervise all mechanical/piping construction activities to ensure all the works are carried out as per project specification and schedule. - Installation of piping systems by using Plan, Isometric drawings and P & ID’s. - Checking of ISO drawings, release for Pre-fabrication of A/G spools based on the priority and material availability. - Involved in loops preparation, Mechanical clearance, Pneumatic testing and final box upof Equipments & Piping system. - Prepared Various Pre-Commissioning Procedures of Piping systems. - Supervised the installation of under ground Fire water / Cooling water lines. - Closely follow the Test-Packs & Preparing punch list of piping systems and ensuring clearingthose points in consultation with client engineers. - Conversant with various international Codes and Standards like, ASME, API, ASTM. - Planning and day wise progress monitoring of work as per schedule. 2. From Nov 2013 - to Oct 2015 . COMMISSIONING ENGINEER (MECHANICAL ENGINEER). (Mong Duong I 2x500MW Coal Fired Power Project). Have worked for Hyundai E&C Co., Ltd. Group No. 8, Mong Duong Ward, Cam Pha Town, Quang Ninh Province, Vietnam (Hyundai Engineering and Construction Company in Mong Duong 1 Thermal Power Plant project). Main duties: Make commissioning and maintenance for Main boiler, Auxiliary boiler, Close circulation water system, Water treatment system, Lube oil system, Circulation water system (Sea water), Primary Fan, Secondary Fan for boiler ... Implementation of maintenance program and activities on mechanical systems and components of Mong Duong 1 Thermal Power Plant. Responsible for the repair, preparation of works, housekeeping and maintenance of all power plant equipment and associated system to assure safe and reliable operations. • Responsible for maintaining the operation of equipment such as boilers, pumps, stokers, water heaters, water softeners, centrifugal pumps, absorbers, cooling towers and purge pumps. • Control oil, water level, dampers in boilers and fuel supply. • Check the flow of stream to make sure about the generation of sufficient steam. • Responsible for regulating flow of steam distribution system and maintain proper temperature of condensing and chilled water. • Responsible for analyzing water samples and add chemicals as needed. • Make sure that all equipment is in good condition and are operating properly. • Responsible for maintaining all production and consumption records. • Oversee, assign and schedule the work of Power Plant Operators and others in the repair and operation of machinery. • Responsible for checking daily logs that help to determine proper operation of equipment. • Plant equipment, floors, windows and tools are cleaned. • Also, provided training and instructions in the proper methods and processes. • Responsible for checking and inspecting new machinery and equipment installations. Responsible for other duties as assigned. • Pump operating experience(WWT, CCW, …) • Effluent water temp. • Oily water trans. pump • Chemical water trans. pump • Effluent water trans. • Thickened Sludge pump Disch • Alum Dosing Pump • Polymer Dosing Pump • Filling water Pumps, CCW Pump.
Tổ chức: Doosan Heavy & Industrious
Giai đoạn: 2015-10-01 -2016-01-01
Hình thức làm việc:
Chuyên môn: Have working for Doosan Heavy & Industrious (Vinh Tan IV 2x600MW Coal Fired Power Project – Binh Thuan province). - Supervising the sub-contractor doing the erection work of HVAC, Fire Fighting, Plumbing and drainage. - Prepare all work documents and make plans for the work. - Prepare and make all of document: MS, ITP, MAS, drawing… - Material receiving inspection, arrange material at site. - Supervise and inspect erection of Subcontractor: as welding piping, installation for pump & equipment, duct line…, Carry out internal line check/ walk down with sub-contractor prior to official inspect with QC and Client. - Attend construction meeting, progress meeting with Manager, Subcontractor. - Coordinate with designer, vendor or other party if have problem occurred. - Reviews and inspects the completeness and proper documents of submitted pressure-test package. - Report daily, weekly and monthly work to Construction Manager.




