Kỹ Sư Cơ Khí Duong Quang Xuong | ứng viên tìm việc Cơ khí/Kĩ thuật ứng dụng tại Đồng Nai
Tên trường: ĐHBK HÀ NỘI
Giai đoạn: 2010 -2013
Tên khoa: kỹ sư quản trị doanh nghiệp
Địa chỉ: Đồng Nai
Ghi chú học tập: văn bằng 2 Tốt nghiệp ngày 15/1/2010
Tên trường: ĐHBK ĐÀ NẴNG
Giai đoạn: 2001 -2004
Tên khoa: kỹ sư cơ khí
Địa chỉ: Đồng Nai
Ghi chú học tập: VĂN BẰNG CHÍNH. KHOA CƠ KHÍ Tốt nghiệp 7/2001
Tổ chức: HYOSUNG VIETNAM Co.,Ltd
Giai đoạn: 10/2009 -1/2011
Hình thức làm việc:
Chuyên môn: Training in Korea 15 days about process. - Control workers. - Arrange work for workers. - Monitoring machine running and record machine running time. - Make maintenance planning (Preventive Maintenance –PM, Opportunity Preventive Maintenance-OPM). - Set up machine CV. - Report month/week/daily to maintenance Team manager. - Work out the monthly machine trouble and put forward corrective action. MTBF (Mean Time Between Failures) and MTTR (Mean Time To Repair). - Control machine spare part, buy spare part, inventory machine spare part monthly. - AHU (Air Handle Unit) section controller.
Tổ chức: DIEN QUANG-TAISIN CABLE Co.,Ltd
Giai đoạn: 1/2007 -9/2008
Hình thức làm việc:
Chuyên môn: 1/2007 to 27/5/2007, I was training in TaiSin Electric Cable company in Singapore. Training: how to make cable, how to control workers. Production: Electric Cable Job title: Chief Of Production. Specific working: Install machines with foreigner experts.(Singapore, Taiwan) Design and improve machines. Buy equipment, spare part for m/c. Design tools for production department. Because 2nd machines, not enough details for running. Guide to workers how to operate machines. Planning for production / month, week, date. Control workers. Monitor production process
Tổ chức: SAMWOO VIETNAM Co.,Ltd
Giai đoạn: 6/2002 -8/2006
Hình thức làm việc:
Chuyên môn: Samwoo VN Co., Ltd (100% capital of Korea) Production: Leather, Synthectic. Job title: Chief of Engineering Team. Specific working: Install machines with foreigner experts.( Korea, Italia, China, Japan) Make planning for maintenance (repair machines) Preventive maintenance. Control workers. Buy equipment and spare part for machines. Design and improve machines. Design tools for production department. Assistant for Engineering Manager. Calculate production service cost / unit product. * When build a Synthectic factory: Supervise construction (6 months). Install machines with foreigner experts.( Japan, Taiwan) Install oil pipe, air pipe, hoist for production…




