Senior Electrical Engineer Hoàng Quang Trung | ứng viên tìm việc Cơ khí/Kĩ thuật ứng dụng tại Thái Nguyên
Tên trường: Đại học kỹ thuật công nghiệp Thái Nguyên
Giai đoạn: 2004 -2007
Tên khoa: Đại học
Địa chỉ: Thái Nguyên
Ghi chú học tập: 1999-2004: Learned in Thai Nguyen University of Technology, bachelor of science 2004. Major: Automation control (Electrical Department). 2010-2012: Learning in Thai Nguyen University of Economics and Business Administration. Major: Business Administration. Configuration programming SIMATIC S7 300, 400 and HMI Certificate Maintenance planning and control Certificate. Operation and maitenance 110KV station Certificate. Project manage Certificate. Bidding Certificate. Appraisal engineer Certificate. Construction supervision Certificate. English language programme (level intermediate) Certificate. Valuation of construction activities Certificate.
Tổ chức: Poyry Energy
Giai đoạn: 2004 -Nay
Hình thức làm việc:
Chuyên môn: Working for Pöyry Energy from Switzerland, consulting for Mong Duong Coal fired Power Plant Project 2x500 MW Main Project feature: The Mong Duong Coal Power Complex project (2,000 – 2,200 MW) to be developed and implemented in Viet Nam consists of two (02) phases. Phase 1 will comprise of 1,000 MW Mong Duong 1 Thermal Power Plant invested by VietNam Electricity (EVN), financed by a loan from the Asian Development Bank’s (ADB’s) ordinary capital resources (OCR) and through EVN self-financing. Phase 2 (Mong Duong 2) with about 1,000 – 1,200 MW of power output will be financed through a BOT agreement. total investment capital of 2 billion USD. With circulating fluidized bed technology (CFB) which is the most advanced synchronous equipments at present time. Position held: - Senior Electrical engineer (consulting for owner). - Supervision installation electrical equipments and commissioning Activities performed: - Design review and give comment, approval for electrical system for thermal power plant as below: + 500KV Station and switch yard. + 110KV Station and switch yard. + Transformer 660MW, 500/21KV; 100MW, 110/10.5KV; 100MW 21/10.5KV. + Hight Voltage and medium voltage of circuit breaker. + Steam turbine Generator, Emergency Diesel Generator. + MV and LV motor + Lighting, earthing, grounding and lightning protection, cable, cable tray..... - Consultant and support for Owner in manage EPC contract. - Consultant and support for Owner in select Sub-contrator. - Consultant and support for Owner in control progress of project. - Supervision of installation and commissioning electrical equipments system. * from October 2009-2011 Worked for An Khanh Coal fired Power Plant Project 2x57,5 MW. Main Project feature: An Khanh Electricity Joint Stock Company is implementing An Khanh Thermal Power Plant Project I in Dai Tu district, Thai Nguyen province. An Khanh Thermal Power Plant is constructed with capacity of 100MW, total investment capital of 3,000 billion VND. With circulating fluidized bed technology which is the most advanced synchronous equipments at present time. the Power Plant shall be officially generated, connected to the National electricity gridwith 800 million KW hours per year. An Khanh Thermal Power Plant II with capacity of 300 MW in Pho Yen district, Thai Nguyen province. Position held: - Senior project electrical engineer. Activities performed: - Made procurement planning. - Manage tender process including issuing tenders and bid clarifications. - Design review electrical system for thermal power plant. - Chief of caculate price of electricity team and negotiation contract sale electricity with EVN. - Project finance analysis. - Prepare and negotiate new contract as below: + Design of SCADA system and connect from An khanh power plant to A0, A1 agreement. + Consultant for project contract. + Supervision contraction and installation equipment contract. + member of team negotiate EPC contract, credit agreement contract. - Check and review all conditions, term of EPC contract - Check calculate total investment capital in advance. - Cost control. - Quantity control. - Progress control of project. *From February 2005- to october 2009 Worked for Cam pha cement project management unit Main Project feature: VINACONEX., JSC is implementing Cam pha cement project in Cam pha district, Quang ninh province. Cam pha cement project Plant is constructed with capacity of 2.5 million tons/year, total investment capital of 6,000 billion VND. Design and supply electrical system by ABB company from Switzerland. Design and supply electrical system in Mill station by SEIMENS company from Germany. Design and supply rotary kiln and technology by Kawasaky company come from japan. Design and supply Conveyor, feed material system by Fam company come from Germany. . Design and supply package system by Haver&Boecker company come from Germany. Position held: - Electrical engineer of project management unit. - Supervisor installation electrical equipments and commissioning. - Chief of team operation, repair and maintenance 110KV station and repair and maintenance electrical equipment for line product. Activities performed: - Worked as officer in Hanoi office - Manage tender process including issuing tenders and bid clarifications as below: + prepare biding documents. + Member of team Evaluation proposal document of tenders. - Contract preparation (prepare new contract and negotiate with contractor). - Made procedure connection plant’s 110KV statoin to 110KV grid national - Check eletrical system design as below: + Power supply low voltage, medium voltage and hight voltage (13 distribution station). + 110KV station. + SCADA system. + Automation control for package area. + Emergency Diesel Generator. + Transformer. + Hight and medium voltage of circuit breaker. + MV and LV motor. + Elevator. + Crain and hoisting. + Compress air, lighting and lightning, cable - Worked as supervisor on the site (in Cam pha, Quang ninh). - Quantity control - Progress control of project. - Supervise installation electrical equipments, commissioning for line product cement together ABB’s supervisor, Kawasaki’s supervisor, Fam’s supervisor, Haver and Boecker’s supervisor… - Made maintenance schedules and inspection of all major electrical equipment to avoid operation stoppage due to breakdowns. - Preparation of requisition for non-available mechanical spare parts for repairs and maintenance. - Chief of manage Operation 110KV station, maintenance and repair equipment field. - Good understanding in lifting, craning, compress air jobs.