Structural & Piping Qc Inspector Nguyễn Xuân Mạnh | ứng viên tìm việc Cơ khí/Kĩ thuật ứng dụng
Tên trường: Đại Học Sư Phạm Kỹ Thuật TPHCM
Giai đoạn: 2010 -2013
Tên khoa: Đại Học
Địa chỉ: Bà Rịa-Vũng Tàu
Ghi chú học tập: Kỹ sư cơ khí , ngành Cơ khí chế tạo máy , tốt nghiệp loại Khá
Tổ chức: Công Ty Tnhh Mekongcông Ty Cp Dịch Vụ Và Kĩ Thuật Phú Mỹ
Giai đoạn: 01/2010 -07/2012
Hình thức làm việc:
Chuyên môn: Nhiệm vụ: Carry out all inspection works following Project Specification, approval engineering and QA/QC document, datasheet and applicable codes/standards. As below: Quality control for equipments. Manage and guide worker group, ensuring workers understand the job. Fit-up inspect follow approved drawings before welding. Check structural & piping dimension and issue Dimensional Inspection Report. Visual inspect all of weld joints. Update information of weld joint and issue Welding Summary Report. Issue Request for Inspection (RFI) to Client’s QC Department following Inspection and Test Plan (ITP). Monitor assembly process for equipment, valve, pump…
Tổ chức: Cmi Group – Belgium-Quatron Workshop
Giai đoạn: 07/2012 -07/2013
Hình thức làm việc:
Chuyên môn: Nhiệm vụ: Carry out all inspection works following CMI’s Specification, approval engineering and QA/QC document, datasheet and applicable codes/standards (EN, AWS, ISO…). As below: - Check Quality of materials before manufacturing, dimension, visual inspection, welding, pre-assembly, NDT inspection, painting, packing….based on CMI’s Inspection & Test Plan (ITP). - Supervise all of the Quatron’s QC Inspectors on site. - Check and take over products following approved drawings & official acceptance agreement. Daily report to CMI’s QC Manager.
Tổ chức: China Steel Sumikin Viet Nam Jsc (Csvc)
Giai đoạn: 07/2013 -Hiện tại
Hình thức làm việc:
Chuyên môn: Nhiệm vụ: - Supervise all of subcontractors, mechanical, chemical & inspection team. Take charge of the following job of corrective and preventive action request (CPAR) which be initialed by QMS audit. - Hold a meeting at the first shift to review the task, comment & announce new information, arrange routine work for all members. - Train technicians to operate the testing equipment, method of inspection job. Ensure the operation procedures and works are carried out based on the “ISO 17025” and “Quality manual of Test Center.” Ensure the accuracy and efficiency of the test and calibration process. - Check & ensure the results of testing samples, surface quality of products correctly & quickly. Carry out new test implemented and equipment installation. - Proof of attendance review, take day off review. Turn-shift schedule/meal, safety & security. Develop the laboratory equipment automatized, data transmission computerized. - Periodic Maintenance supervised and execution, equipment daily check sheet, equipment trouble shooting (Basic), fire-extinguisher check. Supervise test and calibration job, solving trouble problem and providing data with internal and external customer. - Test time controlling, test report reviewing, work Journal issue...base on ISO-17025 or other international/nation standards related activities (JIS, ASTM, EN…).




